Remodeler workflow · Windows

Measure the mixed-trade scope.
Keep what worked.

Measure the plans, price labor and material consistently, communicate a clear proposal, and preserve proven quantities, costs, allowances, and scope for the next remodel.

30-day money-back guarantee · One named user · Two Windows PCs · Works offline after installation

Get the launch link.Confirm your email to receive the launch notice and occasional product updates.

One scope record across the trades

Build the number without rebuilding the job.

Renovation scope rarely stays in one trade. Keep each measured quantity, cost assumption, allowance, and scope decision easy to check before the proposal goes out.

Measure plans or plan-like photos

Import a PDF or image, calibrate from a reliable known distance, and trace the counts, lengths, areas, perimeters, and volumes you intend to price.

Price mixed work clearly

Connect quantities to labor, material, equipment, and subcontract cost items, then review formulas, markups, taxes, allowances, and scope notes.

Send it and save it

Save the estimate you issue, produce the proposal or workbook, compare quotes, and retain proven estimating structure for another phase or project.

  1. Start with the current drawing or a plan-like image that includes one reliable visible dimension.
  2. Organize measured scope by room, phase, or trade so exclusions and allowances remain visible.
  3. Apply reusable costs and formulas, then check the assumptions before saving the estimate.
  4. Send a clear proposal and retain the accepted scope and proven logic instead of retyping it next time.

Photo-assisted calibration is only a starting estimate when perspective or lens distortion is present. Confirm critical dimensions against plans, surveys, or field measurements before ordering or contracting. See the known-measurement photo workflow.

Worked mixed-trade example

A measured remodel, communicated through a complete bid.

The two-sheet Cedar Street plan carries ten measured quantities into a 24-line estimate, saved bid, budget, six-activity schedule, four purchasing records, and fourteen exports.

LVT
400 SF
Tile
400 SF
Partitions
70 LF
Net wall faces
1,134 SF
Estimate lines
24
Bid total
$43,368

This example uses known dimensions and sample prices so you can follow the complete estimate. Verify current drawings, field conditions, labor, material prices, allowances, and subcontractor quotes before bidding.

Takeoff Windows workstation showing the Cedar Street remodel plan, calibrated scale, and ten measured quantities
Takeoff showing the Cedar Street plan beside the ten quantities used to build its mixed-trade estimate.

Founding release · First 250 licenses

Make the next remodel estimate better.

Get Takeoff for Windows