Free concrete calculator

Measured the slab area?
Calculate the cubic yards.

Convert plan-measured square feet and an explicit thickness into concrete volume. See the base quantity, entered waste, and optional supplier-increment rounding as separate numbers.

Runs in your browser · No account · No project values sent to Takeoff

Get the launch link.Confirm your email to receive the Takeoff launch notice and occasional product updates.

Area-to-volume conversion

Concrete yardage calculator

Thickness is converted from inches to feet. Area times thickness gives cubic feet; dividing by 27 gives cubic yards. Waste and supplier rounding remain visible rather than being folded into one unexplained result.

Calculated planning quantity

Measured area
2,400.00 sq ft
Base volume
1,200.00 cu ft
Base volume
44.44 cu yd
Entered waste
3.11 cu yd
Waste-adjusted volume
47.56 cu yd
Supplier rounding
0.19 cu yd
Rounded order volume
47.75 cu yd

The adjusted volume is rounded up to the entered 0.25-cubic-yard supplier increment, adding 0.19 cubic yards beyond the waste-adjusted result.

Planning aid only. This calculator does not establish the measured area or required thickness and does not account for subgrade variation, thickened edges, footings, beams, slopes, over-excavation, displacement, pump or truck limits, minimum loads, hot-weather loss, placement sequence, local code, engineered design, supplier policies, or field conditions. Confirm the drawings, elevations, yield, mix, supplier increment, and final order with the engineer, supplier, and field team.

Worked slab example

See 2,400 square feet become cubic yards.

The default example uses a 2,400-square-foot slab at six inches thick. That produces 44.44 cubic yards before waste and 47.56 cubic yards after an explicit 7% waste factor.

Measured area
2,400 SF
Thickness
6 in
Base cubic feet
1,200.00 CF
Base volume
44.44 CY
Waste factor
7%
Adjusted volume
47.56 CY

The optional 47.75-CY result rounds up to the entered supplier increment. Replace the thickness, waste, and order increment with the project requirements and confirm the final order with your supplier.

Takeoff Windows application showing source-linked concrete slab area and cubic-yard quantities beside the calibrated plan
The same slab area and volume shown beside their source plan in Takeoff. Need area first? Use the separate blueprint scale calculator with a reliable known dimension.

Founding release · First 250 licenses

Carry the cubic yards into a complete estimate.

Takeoff keeps the slab markup, thickness, waste, material and labor pricing, estimate, proposal, and exports together for review and reuse.

Want the marked-plan workflow?Confirm your email for the launch notice and occasional product updates. The calculator stays free.