Takeoff material references

masonry

80 lb general-purpose concrete mix

Bag price alone is not yield; a useful observation preserves package weight and product class so quantity calculations can use the selected manufacturer's current yield.

Comparison specification

material
preblended concrete mix
package weight lb
80
use
general purpose
strength
record manufacturer stated strength and cure basis

Estimator worksheet

Purchase unit
one 80 lb bag
Gross basis
one manufacturer-labeled 80 lb package; volumetric yield is product-specific and must come from the current product data
Quantity method
Calculate placed volume from reviewed geometry, convert it to the unit used by the selected manufacturer's yield, divide by that current yield, include declared waste, and round bags up.
Cost method
Multiply purchase bags by the observed per-bag price. Keep pallet terms, deposit, water, reinforcement, forms, placement, equipment, curing, delivery, tax, and waste separate.

Scope checks before ordering

Do not merge unlike products

Before using a price

Confirm required strength, placement, temperature limits, water demand, yield, cure requirements, pallet deposit, delivery, and applicable project specifications.

Specification sources

Use these first-party references to verify comparison fields before selecting a supplier product. They do not provide the local price, stock status, project design, or code approval.

Local price coverage

No ZIP price is published on this reference page. Record a current exact-product quote or authorized observation manually, including its source, serving market, date, package basis, availability, tax, delivery, account requirements, and validity. A future location page remains separate and evidence-gated.

Related exact material references

Continue with adjacent purchase units without collapsing different grades, materials, sizes, listings, or packages into one generic cost.

Carry the quantity and price into an estimate

Manual cost boundary: Takeoff Field Tools does not fetch supplier prices automatically. Enter the current observed or quoted cost yourself and keep its source, date, quantity basis, and exclusions visible.

Start with the free worksheet

Keep the drawing reference, measured quantity, formula, waste, unit cost, and assumptions together before exporting CSV or printing.

Open the free quantity takeoff sheet

Use the Windows material workflow

See how reviewed drawing quantities, assemblies, cost inputs, warnings, scope, and estimate outputs stay connected without claiming automatic procurement or live supplier pricing.

See the material takeoff workflow