glass
1/4 in (6 mm) clear annealed float glass
A glass area is not a comparable cost until thickness, heat treatment, make-up, coating, fabrication, cut size, yield, and minimum-charge basis remain attached.
Comparison specification
- glass type
- clear float glass
- nominal thickness in
- 0.25
- nominal thickness mm
- 6
- heat treatment
- annealed
- laminated
- false
- coating
- none
- tint
- clear or neutral
Estimator worksheet
- Purchase unit
- one square foot of 1/4 in (6 mm) clear annealed float glass at the quoted cut-piece or stock-sheet basis
- Gross basis
- reviewed net pane area before stock-sheet yield, cutting waste, breakage, minimum charges, fabrication, edgework, handling, and delivery
- Quantity method
- Read each reviewed lite width and height, preserve lite counts and make-up, calculate net square feet by exact glass type, then add explicit stock-sheet yield, cutting waste, breakage, and supplier minimums without inferring safety or structural requirements.
- Cost method
- Apply an observed square-foot rate only when it uses the same thickness, treatment, make-up, fabrication, and area basis; otherwise price whole stock sheets or cut pieces explicitly. Keep tempering, lamination, coatings, edgework, holes, notches, hardware, glazing materials, labor, handling, delivery, tax, waste, and minimum charges separate.
Scope checks before ordering
- Separate annealed monolithic glass from heat-strengthened, tempered, laminated, insulated, coated, tinted, low-iron, mirrored, patterned, wired, fire-rated, and plastic glazing.
- Do not infer safety-glazing locations, structural thickness, wind or impact performance, edge clearances, supports, fabrication tolerances, or code compliance from this cost reference.
Do not merge unlike products
- Do not combine annealed, heat-strengthened, tempered, laminated, wired, patterned, mirror, acrylic, or polycarbonate products.
- Keep thickness, tint or low-iron designation, coating, cut size, edgework, holes, notches, fabrication, and minimum-charge basis visible.
- Normalize a cut-piece or stock-sheet quote to square feet only when the priced area, yield, waste, and minimum charge are explicit.
Before using a price
Confirm the reviewed glazing schedule, exact pane make-up, thickness, treatment, safety-glazing and structural requirements, tint or low-iron designation, coating, edgework, holes, cut sizes, stock yield, breakage allowance, handling, and supplier minimums.
Specification sources
Use these first-party references to verify comparison fields before selecting a supplier product. They do not provide the local price, stock status, project design, or code approval.
- Guardian Clear Glass, North America, 1/4 in (6 mm) — Guardian Glass
Manufacturer reference for North American 1/4 in (6 mm) clear float glass, available fabrication options, and product distinctions. It is not a local price, stock, project-design, safety-glazing, structural, or code-approval source.
Local price coverage
No ZIP price is published on this reference page. Record a current exact-product quote or authorized observation manually, including its source, serving market, date, package basis, availability, tax, delivery, account requirements, and validity. A future location page remains separate and evidence-gated.
Related exact material references
Continue with adjacent purchase units without collapsing different grades, materials, sizes, listings, or packages into one generic cost.
Carry the quantity and price into an estimate
Manual cost boundary: Takeoff Field Tools does not fetch supplier prices automatically. Enter the current observed or quoted cost yourself and keep its source, date, quantity basis, and exclusions visible.
Start with the free worksheet
Keep the drawing reference, measured quantity, formula, waste, unit cost, and assumptions together before exporting CSV or printing.
Open the free quantity takeoff sheetUse the Windows material workflow
See how reviewed drawing quantities, assemblies, cost inputs, warnings, scope, and estimate outputs stay connected without claiming automatic procurement or live supplier pricing.
See the material takeoff workflow