Takeoff material references

drywall

1/2 in regular drywall, 4 x 8 ft sheet

A common interior material with meaningful differences between regular and specialty panels and between carry-out and delivered pricing.

Comparison specification

material
gypsum wallboard
thickness in
0.5
width ft
4
length ft
8
type
regular
edge
tapered

Estimator worksheet

Purchase unit
one 4 x 8 ft sheet
Gross basis
32 gross square ft per sheet before layout, cuts, openings, breakage, and waste
Quantity method
Lay out walls and ceilings as separate groups. Divide gross surface area by 32 only as a check, then round each reviewed sheet category up after orientation, openings, cuts, and waste.
Cost method
Multiply each sheet category by its observed per-sheet price; keep specialty board, tax, delivery, lift, stocking, trim, compound, fasteners, labor, and waste separate.

Scope checks before ordering

Do not merge unlike products

Before using a price

Confirm board type, assembly requirements, sheet length, edge, lift quantities, boom or placement charges, stocking access, and damage policy.

Specification sources

Use these first-party references to verify comparison fields before selecting a supplier product. They do not provide the local price, stock status, project design, or code approval.

Local price coverage

No ZIP price is published on this reference page. Record a current exact-product quote or authorized observation manually, including its source, serving market, date, package basis, availability, tax, delivery, account requirements, and validity. A future location page remains separate and evidence-gated.

Related exact material references

Continue with adjacent purchase units without collapsing different grades, materials, sizes, listings, or packages into one generic cost.

Carry the quantity and price into an estimate

Manual cost boundary: Takeoff Field Tools does not fetch supplier prices automatically. Enter the current observed or quoted cost yourself and keep its source, date, quantity basis, and exclusions visible.

Start with the free worksheet

Keep the drawing reference, measured quantity, formula, waste, unit cost, and assumptions together before exporting CSV or printing.

Open the free quantity takeoff sheet

Use the Windows material workflow

See how reviewed drawing quantities, assemblies, cost inputs, warnings, scope, and estimate outputs stay connected without claiming automatic procurement or live supplier pricing.

See the material takeoff workflow